VCE Systems Engineering Unit 1 — Electrotechnological systems design · Stage 6
Plan production properly: sequence, timeline, milestones, materials, and the risks each process carries.
Open this deck on the projector and press F for full-screen. N toggles speaker notes. The accompanying teacher guide is at /curriculum/vce-systems-engineering-unit-1/teacher/lessons/8.
Before this lesson:
Have the school's own risk assessment template and SDS access ready. Use the real documents, not a facsimile.
Plan production properly: sequence, timeline, milestones, materials, and the risks each process carries.
Have the school's own risk assessment template and SDS access ready. Use the real documents, not a facsimile.
My milestones could be checked by someone else, and my risk assessment covers the tools I will actually use.
Students write a risk assessment for a generic workshop rather than for their own project. A breadboard-only project should have a short one.
Which step are you least confident about, and what will you do if it takes twice as long?
Work plan with Gantt and milestones; risk assessment using the hierarchy of control; priced materials list with lead times.
End of lesson 8
Tomorrow / next lesson: Producing and implementing.